PERSONAL READINESS > Hide Site

Hide Site/Bug out Site construction thread, Part 3

<< < (192/192)

Flyin6:
Then a bit more

Flyin6:
And just like that it was loaded, stacked and padded. Only need to strap it down and hook up to it and I'm on my way

Flyin6:
Back to just a messy shop ready for the next out of square project!

Wilbur:
Very cool....it will be neat seeing that working at the hide site!

Flyin6:

--- Quote from: Wilbur on February 17, 2017, 05:43:49 PM ---Very cool....it will be neat seeing that working at the hide site!

--- End quote ---
Goal is to have it assembled there this week, but without the solar heat collectors. I have yet to find some powerful 12 volt fans. I have a few picked out, but I'll have to make a decision and order them

So after I re-erect the structure, I'll have to figure out the water connection to the tanks, finish the collectors and install them, then to finish, make the connection to the trailer and run a 12VDC wire from the camper's battery.

I'm knocking on the door...

Navigation

[0] Message Index

[*] Previous page

Go to full version