VEHICLES, CAMPERS, and BOATS > Build Threads
SquareD Part 5: The build continues and gets more aggressive
Flyin6:
The paint turned out OK...I had some runs, but that is expected since I was trying to blow it into spaces between the mount bars and the floor.
BTW that tank is made from 1/4" wall aluminum with 1/2" think legs and mounts. Frankly I wanted it to serve as an emergency jacking point!
Flyin6:
With the quick flash of some wrenches it was permanized into it's new home.
Look how well it fits between and fills up those frame rails!
Dan did a great job building that tank!
Flyin6:
Now this motor is a no kiddin' 600-700 HP mill. Looking at the factory fuel system I have never been impressed.
It uses tiny lines barely 5/16" in diameter which I knew had to go. So go they will. I'm starting at the injection pump and changing it from a single inlet to a dual inlet with 1/2" lines
Flyin6:
Here is the new dual inlet line kit from Cummins Performance Parts, CPP.
Flyin6:
Here is one of the fittings installed. The other fitting goes into a port in the front that had a hex plug
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version