Hide Site/Bug Out Location Construction, Part 7
Flyin6:
Which leads to the forms set for the patio concrete pout coming tomorrow:
Flyin6:
Next up, The big holding tanks were moved and prepped (pending a couple of parts) to ready them for their new permanent home
Flyin6:
I think those fittings are 4" PVC. Not sure, but I will be tomorrow when I visit the plumbing store
They fit into previously cut holes in the side/bottom of the green tanks where they once resided below ground and held rain water there as well
And, I had to create a wrench big enough to tighten it all up...And it worked!!!
Atkinsmatt:
Great progress. Love to check in.
Flyin6:
I installed the fittings and snugged up the "Nuts"
Hopefully, tomorrow, I'll be able to place the tanks on site below the gutters and get that huge fitting all the way down to 1" PEX