0 Members and 4 Guests are viewing this topic.
Next, I set the two 12 foot sections (Yea...12 foot sections...) onto the beams, made a discovery, but bolted them back together
I just don't want to wind up missing a digit or limb. I can sometimes get in a hurry to get results.
Quote from: Flyin6 on April 22, 2017, 05:39:49 PMNext, I set the two 12 foot sections (Yea...12 foot sections...) onto the beams, made a discovery, but bolted them back togetherA small oversight. Looks like your solution will be fine though. In no time you'll be cutting!
Wow, full pics and you and feet that are better looking than yours!Looks like it works good. Whats next?
Keying on the advertising of being able to cut a 20' log, I forgot to account for the two foot overhang due to the width of the mill head. So...it looks like I am not done building the support base. I think the 6 X 6 beams come in a six foot length, so I'll pick up two of those along with six bags of crete and finish the job. I already added the pieces of wood to be used as splices, I'll add some steel on the other side to strengthen it all up
Tomorrow, I will build in the rest of the support and start on erecting the buildingIll be cutting posts, then putting them into the ground, and on and on until I have the frame up...
And now comes the funny part.My Frau kept complaining that her feet hurt. One glance and I discovered whyShe has done this several times in the past. Most notable was the time she left the house with a heel and a flat!No, I have no idea how someone could do that!!!
Quote from: Flyin6 on May 13, 2017, 10:12:02 PMAnd now comes the funny part.My Frau kept complaining that her feet hurt. One glance and I discovered whyShe has done this several times in the past. Most notable was the time she left the house with a heel and a flat!No, I have no idea how someone could do that!!!Im not sure how she got her toe nail polish to match her "capris" (clam diggers, short pants, jams, whatever they call them) either, but did you notice she is wearing two different sandals??
Quote from: Flyin6 on May 14, 2017, 05:56:53 PMTomorrow, I will build in the rest of the support and start on erecting the buildingIll be cutting posts, then putting them into the ground, and on and on until I have the frame up...Just out of curiosity, have you ever written a "to do" list for the hide? I feel like it would be miles long.
Quote from: wyorunner on May 14, 2017, 06:33:29 PMQuote from: Flyin6 on May 14, 2017, 05:56:53 PMTomorrow, I will build in the rest of the support and start on erecting the buildingIll be cutting posts, then putting them into the ground, and on and on until I have the frame up...Just out of curiosity, have you ever written a "to do" list for the hide? I feel like it would be miles long.Yea, I had plans, but the plans changed, then the resultant along with other factors caused me to change plans again.I obviously need a building up and around the saw, so that's upI need to imporve on the water situation down there, so I will be working on that too.I want to install a fuel tank with a few hundred gallons of red diesel. so that's this summer.I still want to scab on a porch to the shedAnd by the winter I want to be tearing out the top area and add shed dormersor hire people to do all that if I am away doing something else.