0 Members and 1 Guest are viewing this topic.
Shawn, your four post lift, is it bolted down or on rollers?
Would just need electric and air connections at both locations. Or am I missing something
This project is now a year old. Thanks to the Covid excuses everything takes forever.
Quote from: Bob Smith on October 22, 2021, 04:41:29 PMThis project is now a year old. Thanks to the Covid excuses everything takes forever.My wife recently mentioned building our cabin next year. I didn't laugh, but that was my first instinct.Nice progress sir.
Quote from: KensAuto on October 22, 2021, 09:59:40 PMQuote from: Bob Smith on October 22, 2021, 04:41:29 PMThis project is now a year old. Thanks to the Covid excuses everything takes forever.My wife recently mentioned building our cabin next year. I didn't laugh, but that was my first instinct.Nice progress sir.You building it or having it built?
Bob, you are dried in before the winter Monsoon hits, big plus!
lol. We should start a thread. “Thing my spouse and I disagree on”Sent from my iPhone using Tapatalk
Got the final on the garage. No power yet and without heat I will never get it dried out. The floor stays wet most of the time because of all the moisture in the air.
Thanks Shawn, the lift will be ordered soon. Thanks again for all the help
Never heard them called that. I think we refer to them as eave blocksSent from my iPhone using Tapatalk
Nate, usually don’t head south till after Christmas. Might be running a few weeks later this year but still plan on going down.
Started spreading 3/4- crushed basalt rock against the garage apron and down towards the driveway. Need at least 3 more 3 yd. loads to get close to grade. Might lay a perf pipe next to driveway to carry water away. One foot deep trench four inch perf pipe covered to top of pipe with 7/8 drain rock and 3/4 clean up to grade maybe a couple inches.