0 Members and 1 Guest are viewing this topic.
Anyone on here with some tile experience game to lend an FNG some insight? 90% of my center two rows are cracked, grout is missing/falling out, and the tiles are loose and barely hanging in there. It looks like I could tackle this one myself, but I don't want to dive in uneducated and make rookie mistakes. 11-23/32 x 11-23/32 square tile on the floor including cut tile. assuming i'll need a full piece for each one currently in place I'm looking at 32 pieces, plus 10 for screw ups sound right? I don't believe any concrete backing was used in the original application and they were laid directly on the subfloor. i'll be remedying that, but any other tips/tricks suggestions would be greatly appreciated.
So, Bobby...being the calculating trained warrior NCO that you are. Take the appropriate action, Execute!
your standard grunt level CQB is just putting rounds and rounds on scary stuff till it stops scaring you!
we've got wood everywhere else upstairs, then hallway and 2 bedrooms are carpet w/ tile to contrast in the guest and master bath. both need replacing but the guest is completely shot. I want to go with tile, but done right this time.
Tate I have a lot of experience with tile. Are we dealing with tile over plywood subfloor on the first or second floor, and is the plywood on joists, if so what depth and spacing?Sent from my iPad using Tapatalk
Quote from: TexasRedNeck on August 11, 2016, 05:47:53 PMTate I have a lot of experience with tile. Are we dealing with tile over plywood subfloor on the first or second floor, and is the plywood on joists, if so what depth and spacing?Sent from my iPad using Tapatalk2nd floor, over plywood subfloor on joists. Depth? spacing???
you keep listening to these guys and youll end up spending $50k on a full bath remodel.....OIL CHANGE............;D
you keep listening to these guys and youll end up spending $50k on a full bath remodel............;D
Quote from: nmeyer414 on August 12, 2016, 08:23:23 PMyou keep listening to these guys and youll end up spending $50k on a full bath remodel.....OIL CHANGE............;Dm
Sent from my iPhone using Tapatalk
I'd be happy now just to find the time for it. I gotta schedule my schedules
Quote from: TexasRedNeck on August 13, 2016, 07:10:35 AMSent from my iPhone using TapatalkThat's a little plain for my taste ;)
Quote from: EL TATE on August 24, 2016, 12:02:14 PMI'd be happy now just to find the time for it. I gotta schedule my schedulesPurchase metal barrelPunch holes in metal barrelRemove HEAD of male who didn't heed my requirements to date my daughterPlace in barrel and load in truckDrop off streamside near Sophie's "picture rock"Select Tile for BathroomDemo BathroomRefer to DOT suggestions for laying said tileContact an actual Tile Specialist as DOT's are full of itSchedule a massage in new bathroom with candlesIgnore DOT's comments trashing my Bathroom Build ThreadThere, got you started Tate!
Quote from: EL TATE on August 24, 2016, 12:01:39 PMQuote from: TexasRedNeck on August 13, 2016, 07:10:35 AMSent from my iPhone using TapatalkThat's a little plain for my taste ;)Maybe more like thisSent from my iPhone using Tapatalk