TOOLS, CONSTRUCTION, ALTERNATIVE ENERGY > What are you building?
The Other Dave’s house
Bob Smith:
And if water might be an issue set the cut edge up.
TexasRedNeck:
Lumber will squeak and move at some point. Just pour concerted in it and call it done.
That’s a massive spread. You need a lot of kids to fill it up!
Sent from my iPad using Tapatalk
dave945:
I did look into having concrete done, but seems like every contractor worth anything in the northern Kentucky area is about two months out and couldn’t really even get a price.
Sent from my iPhone using Tapatalk
TexasRedNeck:
What’s the size of the room?
Sent from my iPhone using Tapatalk
Bigdave_185:
I would lay a 2x4 flat around the perimeter, that gives you a air gap and no floor rubbing on concrete, span the gap with 2x? And then glue and sheet the floor.
Leaving a gap on the floor eliminates the unlevel or wavy concrete and your floor can be smooth.
Sent from my iPhone using Tapatalk
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version