TOOLS, CONSTRUCTION, ALTERNATIVE ENERGY > What are you building?

The Other Dave’s house

<< < (2/17) > >>

Bob Smith:
And if water might be an issue set the cut edge up.

TexasRedNeck:
Lumber will squeak and move at some point.  Just pour concerted in it and call it done.

That’s a massive spread.  You need a lot of kids to fill it up!


Sent from my iPad using Tapatalk

dave945:
I did look into having concrete done, but seems like every contractor worth anything in the northern Kentucky area is about two months out and couldn’t really even get a price.


Sent from my iPhone using Tapatalk

TexasRedNeck:
What’s the size of the room?


Sent from my iPhone using Tapatalk

Bigdave_185:
I would lay a 2x4 flat around the perimeter, that gives you a air gap and no floor rubbing on concrete, span the gap with 2x? And then glue and sheet the floor.
Leaving a gap on the floor eliminates the unlevel or wavy concrete and your floor can be smooth.




Sent from my iPhone using Tapatalk

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version