Tex, that was many years and many permit requirements ago
JR,why not living quarters on the second floor? Also where are you sourcing the solar powered water pump from and cost?
Looks like it just went flat and that happened going to my place, about 1/4 mile on rocky dirt road.Was more the time it cost vs the $$. Very little got done that day. Right sized spare is needed.
That’s some good dirt work for that small skidSent from my iPhone using Tapatalk
Would the box blade be better to travel with material instead of scoopin? Sent from my iPhone using Tapatalk
Jr, what are you using or how are you ensuring what you are digging out is actually level?
Also a length of time b4 actual building starts will suffice, assuming that depends on rainfall of area
Quote from: stlaser on May 18, 2020, 07:35:38 AMAlso a length of time b4 actual building starts will suffice, assuming that depends on rainfall of area Most want a freeze/thaw. And the more cycles the better. Back in the clay basin soil around Clarksville, TN builders were looking for 8-12 cycles (years)But, I don't know about that sandy soil, never played in except in other countries where I wasn't building anything.