0 Members and 1 Guest are viewing this topic.
That's awesome. Id love to have one I could stack. But with several smaller caners I have my process down where I can rotate them. I get one batch in and start on the second. By the time the second is ready the first is half done. So I get a 3rd batch ready about the time the first is done so I reload that one and so on. I have non stop jingle jingle in my basement all afternoon. There are a lot of times I end up with a batch and half. Having a big one like that would be very handy.
Looks like a scene from breaking bad is fixing to happen... but a redneck version. Sorry Nate... was the first thing that came to mind.
why you always baggin on el paso, heard there's some good salsa there?
- Everything's gone in life nothing is left...